Setting the Roof Trusses and sheeting/shingling the roof
.
June 4, 2012
.
These pictures were taken on Monday June 4th and Tuesday June 5th; the roof was constructed and "papered" on Monday and the shingles were put on on Tuesday
.
Preps for the Roof Work
.... . .
On the picture on the left, they had taken the cover off the door and as Mindy said, it looks like with a house now that you can see the front door. In the center picture, they have put down a walkway so you can get in and the left shows the crane getting ready to unload the truck with the roof supplies
.
.... . .
Just unloading supplies off the truck and moving the Trusses so they are not in the way
.
.... . .
More unloading
.
.... . .
Finishing the unload - you can see an empty truck at the end.
.
Stripping the Temporary Roofs of of the Modules
.... . .
The modules has these little "mini roofs" to protect them on the road trip and to protect the inside until the roof was set - The roofers are topside starting to remove the these temporary roofs.
.
.... . .
You can see them pulling the plastic off on the master bedroom module
.
.... . .
After taking the plastic off, the remove the structure that was built to staple the plastic to - they are moving on to the next module
.
Installation of the Trusses
.... . .
First Truss going up - also known as the "Gable End".
.
.... . .
----Second and Third Truss
.
.... . .
Couple of pictures of #4 and then the 7th Truss on the way
.
.... . .
More trusses - the pictures on the left and middle are the trusses for the Great Room; you can see the vault. The truss on the right has the vault in the back for the Great Room and the vault in the front for the foyer
.
.... . .
A couple more Great Room/Foyer trusses and then the house with all the trusses on them (I was off doing other things so I did not take a lot of pictures for awhile)
.
Putting the OSB sheets on the Roof
.... . .
Sheets are going on - these guys carried the first 6 or 8 sheets up the ladder by hand
.
.... . .
After they got enough sheets on, the built a little platform and the crane brought up a bunch of panels
.
.... . .
Putting the sheets down-
.
.... . .
More sheets being put down - starting on the left side
.
.... . .
You can see the left side being built - They did the same thing over here - carried the fist 6 or so sheets by hand and then had the crane put some sheets on.
.
.... . .
The crane is putting the bundle of sheeting on the roof for the other side
.
.... . .
Sheets are being put down
.
.... . .
As they were finishing up the front, half the crew went to the back side of the house - the crane held the stack until the set enough sheets to build the platform
.
.... . .
You can see how there were about 6 or 8 sheets turned sideways so the could start the sheeting on the back
.
.... . .
I went inside the house and took a few pictures - these were taken from the Great Room (because the Great Room is vaulted, the ceiling was not installed.
.
.... . .
Couple of more pictures from inside of the back of the house - then a picture of the progress on the front of the house
.
.... . .
Finishing up the front and they are carrying the leftover sheets from the font to the back side of the house.
.
.... . .
Taking more sheets to the back of the house and a couple of pictures of the back side of the house.
.
.... . .
Finishing up the back of the house.
.
Papering the Roof
.... . .
They put the "ice dam" rubber coating down and then the paper - they are no longer using tar paper, they use the plastic white paper
.
.... . .
Finishing up the paper
.
End of the day
.
They also completed "papering" the back of the house; and then the left to come back on Tuesday to put the shingles on.
.
June 6th, 2012
.
Day two of the roofing - There are not a lot of early pictures because it was raining like crazy until about 10:30 am. The roofers were going to wait for it to stop raining but they went inside the house and it was leaking pretty bad. They did a lot of work while it was raining and I wasn't taken pictures so the camera would not get wet.
.
Shingling the Roof
.... . .
This is where they were (picture on the left) when it stopped raining about 10:30 or 11 am
.
.... . .
The front is pretty close to done and they are getting ready to move the crane
.
.... . .
The crane is out of the way and you can finally see what the house looks like - the "un-shingled" area is where the carport ties in; they did end up covering that with the "ice dam" material before they left
.
.
ALL DONE!!!
.... . .